Product
Changelog
What changed in each version of each visual, newest first. The first public versions ship at launch.
Spread
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- Ridgeline chart and grouped boxes with a new Compare by field, both in Pro.
- Pro needs a licence or trial key; without one, Spread draws the free box plot with a short notice and a “Try Pro free” button.
- Licensed company shown in the Licence card.
- First build: box plot, violin and beeswarm, outlier rules, cross-highlighting, English and Norwegian.
Histogram
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- First build: automatic or set bins, counts or percent, mean and median, density and normal curves, two groups, and spec limits with Cp and Cpk, English and Norwegian.
Change
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- Pro needs a licence or trial key; without one, bullet falls back to lollipop and slope to dumbbell, with a notice and a “Try Pro free” button.
- First build: dumbbell, lollipop, bullet and slope charts, English and Norwegian.
Bridge
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- First build: bridge from a category or from measures, subtotals, target gap, horizontal bars, English and Norwegian.
Delta
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- Sparkline height capped in tall tiles.
- First build: up to 8 tiles, signed variance, lower is better, neutral band, sparklines, English and Norwegian.
Variance
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- First build: actual against previous year or plan in the IBCS look, absolute and percent variance charts, forecast, both comparisons, line chart and Top N with Others, English and Norwegian.
Days
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- Pro needs a licence or trial key; without one, Days shows the latest 12 months with a notice and a “Try Pro free” button.
- First build: months and weeks-in-a-row layouts, sequential and diverging scales, English and Norwegian.
Lanes
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- First build: task bars in lanes, milestones, progress, a today line, a fitted or scrolling time axis, dependency arrows, critical path and planned dates, English and Norwegian.
Period
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- First build: 13 presets that move forward to today, a range bar with a value chart, fiscal years, a compare-to period and your own preset, English and Norwegian.
Tree
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- Licence check brought in line with Filter.
- The free version shows up to 250 boxes.
- Export view no longer goes blank on very wide trees.
- Icon redrawn so it shows in Power BI’s dark mode.
- First build: cards with rolled-up values, search, folding branches, stacked teams, colour by field and export view, English and Norwegian.
Filter
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- First build: tree of checkboxes with half ticks and counts, search, level buttons, the picked line, more levels, large lists and values with bars, English and Norwegian.
Tiers
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- First build: label over a multi-level header, shaded subtotals, folding groups, percentages and shading, English and Norwegian.
Statement
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- First build: account hierarchy with Power BI subtotals, actual against plan or previous year with variance bars and pins, both comparisons, result rows and percent of a row, English and Norwegian.
Signal
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- First build: XmR, run, p′ and u′ charts, the four rules with plain-language labels, verdict and target assurance, phases and the board view, English and Norwegian.
Pareto
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- First build: sorted bars, cumulative line, threshold and vital few with a summary, Other bar, ABC classes, before and after, and small multiples, English and Norwegian.
Risk
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- First build: likelihood by impact grid with band colours, risks as names, numbered dots or counts, movement since the last review, size by exposure and the ranked risk list, English and Norwegian.
Plan
- Renamed from Linjal to Grafpoint, with a new visual ID. Reports made with an earlier build need to add the visual again.
- The support link, email and trial link now go to getgrafpoint.com.
- First build: your own SVG drawing coloured by a measure, name matching, zoom and pan, maps from data, % of target, colour bands and colours from a measure, English and Norwegian.